Viborg Sand & Gravel will be working on sewer lids and the Marina parking lot the week of October 5. Please plan around these closures:
- Mon., Oct. 5: Saw cutting and concrete demo at sewer lids on Timberline and Heritage Loop Rd. Two-way traffic allowed.
- Tues., Oct. 6: Marina lower parking lot grinding and tack oil. Closed to all traffic.
- Wed., Oct. 7: Marina parking lot paving. Closed to all traffic.
- Thurs., Oct. 8: Marina parking lot oil seal. Closed to all traffic. Asphalt dig-out at Timberline sewer manholes. Traffic OK.
- Fri., Oct. 9: Asphalt dig-out at two sewer manholes on Heritage Loop Rd. Road closed, detour set up.
Schedule may change. Thank you for your patience.