This page is intended to provide the Heritage Ranch Owners Association membership with updates as close to real-time as possible. Below you will find a table that lists all the current projects and what stage they are in:
Projects will remain on the list for 12 months after the project has concluded.
Below is a table that will give a status update and a quick note reference as to where the project is. Please check back frequently for the most current information. There may be times when there are no new updates, as some projects may be placed on hold due to work site conditions, delays with supplies, shifting project priorities, or other reasons. If this does happen, the latest update will include that information, and additional updates will be added as they become available.
If you do not see a project on this list that you have questions about, please contact the Maintenance team at 805-238-9641 x430 or office@hroa.us for assistance. The team will inspect and investigate prior to adding to this list and will provide an update directly if it is not one that falls within the association’s responsibility and will not be included in the list below.
For the 2025 mowing schedule, please click here.
Last Updated: August 08, 2025
| Project Name | Status | Site Walk | Bids Due | Board Review | Board Approved | Remarks |
|---|---|---|---|---|---|---|
| Annual Mowing | Awarded | N/A | N/A | N/A | Yes | 100% – Touch Ups |
| Heritage Park Pool – Solar Heating Structure Repairs | Identified | N/A | N/A | N/A | Temporary repairs made, proposals needed | |
| Marina Road Repair | Awarded | N/A | N/A | N/A | Yes | Pending work dates |
| Upper Comanche Spillway | Awarded | N/A | N/A | N/A | Yes | Completed |
| Marina/Heritage Land Bridge | Awarded | N/A | N/A | N/A | Yes | Completed |
| Camera Upgrade | Awarded | Installation has begun-In Progress | ||||
| Network Upgrade | Awarded | Installation has begun-In Progress | ||||
| Landscape Service | Bidding | 21-Jun | 9-Jul | 25-Jul | 80% Completed | |
| Road Repairs (1990) | Bidding | 24-May | 9-Aug | 22-Aug | Spot repair patching only | |
| Boat Dock Refurbish | Bidding | 21-Jun | 9-Jul | 25-Jul | On Hold Until After Boating Season | |
| Monument Signage | Re-Bid | Need to Re-bid (only 1 received)- Waiting for Involved Property Owners | ||||
| Equestrian Guest Barn Repairs | Re-Bid | Need to Re-bid (only 1 received)- No New Info | ||||
| Pergola Replacement @ Heritage Pool | Minor repairs have been made | |||||
| Equestrian Pool Bathroom Roof Repair | Completed | Completed | ||||
| Cruise Circle/Longview Swale Repair | In Review | Waiting for Engineering | ||||
| Equestrian Center Bridge | Identified | Waiting for Engineering | ||||
| Gateway Drainage | Identified | Preparing documentation – pictures, outline, etc | ||||
| Windmill Drainage | Identified | Preparing documentation – pictures, outline, etc | ||||
| Wood Duck Drainage | Identified | Preparing documentation – pictures, outline, etc | ||||
| Pickleball Court Resurface | Identified | Preparing documentation – pictures, outline, etc | ||||
| Identified | ||||||
| Tennessee Walker Slope | Identified | Preparing documentation – pictures, outline, etc | ||||
| Road Repairs (446) | Identified | Preparing documentation – pictures, outline, etc | ||||
| Mammoth/Gold Rush Drainage | Identified | Preparing documentation – pictures, outline, etc | ||||
| Heritage/Water View Culvert | Identified | Preparing documentation – pictures, outline, etc | ||||
| Restroom Renovations | Identified | Completed | ||||
| Pump Track | Identified | No New Info | ||||
| Gate Operator Replacement / Repair | No New Info | |||||
| Equestrian Center Bridge | On Hold | No New Info | ||||
| Bridle Trail Storm Drain Repair | Scope Development | Engineer Design Phase-No New Additional info | ||||
| Chaparral Drainage | Scope Development | Working on Drainage Plan for entire Ranch – More to follow | ||||
| Heritage/ Equestrian Culvert Repair | Scope Development | Engineer Design Phase | ||||
| Northfork Washout Repair | Scope Development | 1st Phase Completed, Awaiting 2nd Phase-Engineering-Additional repairs will need to be made | ||||
| Big Bear Slope | Scope Development | Engineer on-site visit 28 May -Awaiting additional info from Engineering | ||||
| Pinto Slope | Scope Development | Awaiting additional info from Engineering | ||||
| Blackhorse Slope | Scope Development | Engineer on-site visit 28 May -Awaiting additional info from Engineering | ||||
| Sorrel Pond Repair | Scope Development | Engineer on-site visit 28 May -Awaiting additional info from Engineering | ||||
| Valley Lane Slope | Scope Development | Awaiting Engineering update with costs to go to BOD | ||||
| Old Office Demolition | Scope Development | In Review | Awaiting bids and proposals along with demo permitting | |||
| Downed / Dead Tree Removal | Scope Development | N/A | N/A | N/A | CalFire – Conservation Corps- In Process |